2023 Toyota Corolla Ascent Sport Hybrid - Front Wheel Drive

$29,990*

Location
Oldmac Toyota Cleveland
Model Year
2023
Type
Pre-Owned
Kilometres
48,844
Colour
Frosted White
Transmission
Automatic
Engine
1.8L Hybrid
Body
Hatch
Vin #
JTNKE3BE403507806
Reg #
756NJ9
Stock #
CU00659

Car Description

An Amazing opportunity to grab a 2023 Toyota Corolla Ascent Sport Hybrid Hatchback finished in stunning Pearl White Paintwork. This Toyota Certified Pre-Owned Vehicle provides the new owner with a 12 Month factory backed warranty extension and 12 months roadside assist. Toyota Access Finance with Guaranteed Future Value is available on this car. It won't last long so don't delay and book a test drive today. We are located 30 mins from the Brisbane CBD on the Bayside. Finance is available and trades are most welcome.

Call Us

Just some of Oldmac Toyota Cleveland's advantages: